Milestonessgeissler2023-01-23T07:18:02+00:00 Milestones 2022 GripCon Ø 83 for Vestas V236 – 15 MW Blue Marlin offshore Windturbine drivetrain with 36,600 kNm torque transmission 2021 TTG Bolts and Nuts for 6 MW HZ-Power floating platform 2022 Series supplier for GE Haliade-X wind turbines (>12 MW power) with TTG Bolts and Nuts 2021 Thread rolling machine for fast, precise and increasing fatigue strength production of TTG and DIN thread bolts 2021 First 24/7 automated production line for large series production 2021 Acquisition of a 28,000 m² plot of land for Werk 3 in Erkelenz 2020 Main supplier for the main drive train connection of the VESTAS EnVentus wind turbines platform 2020 Large series equipment for a chinese offshore wind turbine manufacturer with SCHAAF TTG joining elements for 111 plants 2020 Expansion to 10.000 m² (Werk 2) 2019 TTG Bolts and Nuts for biggest crane Liebherr ever built bearing diameter Ø 17,190 mm for M120x6 bolt on slewing bearing 2019 ExpaTen QL for all V164 and V174 Turbines (8,5-10 MW) 2018 1st use of the Bolt Robot after only 3 months development time 2017 MST Multiple Stud Tensioner with 32 bolts bigger than Ø 100 mm 2016 Implementation of SCHAAF Online Product support and online channels 2015 Order for the world largest forging press (mounting tools) 550MN 2013 Establishment of SCHAAF Service GmbH 2012 Expansion SCHAAF China in Taicang on 1,500 m² 2011 Award “BEST IN TECHNOLOGY (MAN)“ 2010 Takeover of Fastec AG, Switzerland 2009 Expansion to 7,000 m² 2007 Start SCHAAF China in Shanghai on 60 m² 2005 Expansion to 4,000 m² 2003 Expansion to 2,200 m² 2000 New building and relocation to 1,600 m² 1990 Takeover by Ralf Koellges 1977 Company established by Martin Schaaf 1965 NPP Ringtensioners from M. Schaaf at Wirth 1954 First Bolt Tensioners, designed by Martin Schaaf at the company Wirth News Contact persons Company